Win / KotakuInAction2
KotakuInAction2
Communities Topics Log In Sign Up
Sign In
Hot
All Posts
Settings
All
Profile
Saved
Upvoted
Hidden
Messages

Your Communities

General
AskWin
Funny
Technology
Animals
Sports
Gaming
DIY
Health
Positive
Privacy
News
Changelogs

More Communities

frenworld
OhTwitter
MillionDollarExtreme
NoNewNormal
Ladies
Conspiracies
GreatAwakening
IP2Always
GameDev
ParallelSociety
Privacy Policy
Terms of Service
Content Policy
DEFAULT COMMUNITIES • All General AskWin Funny Technology Animals Sports Gaming DIY Health Positive Privacy
KotakuInAction2 The Official Gamergate Forum
hot new rising top

Sign In or Create an Account

73
()
posted 2 years ago by DoomerPill 2 years ago by DoomerPill +73 / -0
57 comments share
57 comments share save hide report block hide replies
You're viewing a single comment thread. View all comments, or full comment thread.
Comments (57)
sorted by:
▲ 29 ▼
– Piroko 29 points 2 years ago +29 / -0

4 years to build in the first place

It took nine years from the bond issue (1968) to completion (1977).

The estimate of 10 years to reopening is reasonable and consistent with what it took to build it originally when you take into consideration the four years of project prep-work that happened between the bond issuance and the start of construction.

Frankly, I think ten years is pessimistic. If the existing approaches can be salvaged it will take a good year or two off the construction time. They don't have to do any new geological studies to rebuild the cassions.

permalink save report block reply
▲ 20 ▼
– JustHereForTheSalmon 20 points 2 years ago +20 / -0

Is there a reason that prep-work needs to be done again? Genuinely don't know: presumably the formerly built bridge had engineer-approved plans where all the math and physics were worked out and validated.

I mean, aside from clearing the wrecked bridge so that you can build it in the same spot.

permalink parent save report block reply
▲ 11 ▼
– dzonatan 11 points 2 years ago +11 / -0

I'm no bridge engineer but if the collision caused enough stress across the entire structure to the point of causing fractures in underwater foundation blocks then I'd imagine they might have to dismantle them as well.

permalink parent save report block reply
▲ 10 ▼
– Piroko 10 points 2 years ago +10 / -0

Lead time on orders. Old bridge was 4-5 thousand tons of steel that has to be scheduled into some (already busy) foundries, and you can't even start putting it together until you've got a lot of the pieces staged and ready.

But frankly I doubt they'll rebuild it "as it was". They might as well throw on a couple extra lanes and use a newer style. They could do something a little more grandiose, like the Rio-Antirio bridge.

permalink parent save report block reply
▲ 8 ▼
– Hullohoomans 8 points 2 years ago +8 / -0

Sadly, those foundries have be relocated to (checks notes) China.

permalink parent save report block reply
▲ 7 ▼
– Assassin47 7 points 2 years ago +7 / -0

But frankly I doubt they'll rebuild it "as it was". They might as well throw on a couple extra lanes and use a newer style.

They'll also rename it to the George Floyd bridge or some shit because Francis Scott Key owned slaves.

permalink parent save report block reply
▲ 5 ▼
– bamboozler1 5 points 2 years ago +5 / -0

Regardless of styling, they should definitely, definitely add on more protection for the bridge pylons, this time, particularly around that shipping lane…

You obviously know more about this than I, but that was one of the things I heard discussed, even early on, to prevent incidents like this happening again, so surely…

permalink parent save report block reply
▲ 6 ▼
– Piroko 6 points 2 years ago +6 / -0

Nah.

I think it's more likely that the NTSB will come up with more aggressive rules on when pilot tugs are required.

permalink parent save report block reply
... continue reading thread?
▲ 7 ▼
– NiggaYouGay 7 points 2 years ago +7 / -0

Why can't you just participate in the circle jerk?

permalink parent save report block reply
▲ 2 ▼
– deleted 2 points 2 years ago +2 / -0
▲ 1 ▼
– powerneed 1 point 2 years ago +1 / -0

yea i have a road by my house that was meant to take 1 year its been 6 and a half years and its still not finished 10 years is if anything much to optimistic.

permalink parent save report block reply

Original 8chan Links to Gamer Gate:

.

The main GG discussion is on the videogames board: https://8chan.moe/v/

.

GamerGate archive is at https://8chan.moe/gamergatehq/

.

GamerGate Wiki:

https://ggwiki.deepfreeze.it/index.php/Main_Page

. . . . . .

. . . . . .

Rules:

.

ONE: Do not advocate for illegal violence or post other illegal activity. (Be aware of your local laws.)

.

TWO: Don't threaten, harass, or impersonate users. Also: don't be a psycho. New users will be held to a higher standard.

.

THREE: Do not post porn.

.

FOUR: NSFW/NSFL content must be flaired NSFW.

.

FIVE: No vote manipulation. Do not break communities.win's features.

.

SIX: No spam or reposts. Do not make more than 5 threads a day.

.

SEVEN: Do not post falsehoods and hoaxes that are obvious to an uncontroversial degree.

. . . . . .

. . . . . .

Moderation Logs:

.

(Two different versions, Scored has more features and is cleaner, but .win let's you see a few more details in certain instances.)

  • Scored
  • .win

Moderators

  • DomitiusOfMassilia
  • C
  • BandageBandolier
  • CarmenOfSandiego
  • The_Shadow_of_Intent
  • SocraticMethod1
  • Kienan
  • Smith1980
Message the Moderators

Terms of Service | Privacy Policy

2026.02.01 - 8wn6p (status)

Copyright © 2026.

Terms of Service | Privacy Policy