Germany get what they deserve for shutting down their landlocked nuclear plants because a tsunami hit one on the other side of the hemisphere. As do France and every other EU nation that were stupid enough to listen to Greenpeace and other morons.
Upper estimates can sometimes say 20 years but that's likely not entirely accurate as it probably includes a lot of the planning stages beyond the actual construction. Then again using larger numbers like that to dissuade the general public isn't exactly a new thing and if ever called out on it the phrasing is still "technically correct".
pretty sure Europeans would be capable of putting a Notre Dame with a nuke reactor in it in every capital city in Europe in a year if nobody tried to fill their pockets in the process
Thing is:people who own them said they can start again without issues. The retarded lefty green coalition will not allow it though when the supposed """right wing""" were not up for it(in quotes because the CDU/CSU has got nothing to do with conservatism, if they did they would form a coalition with the afd).
It is greatly frustrating that humans unlocked the secret to cheap, clean and unlimited energy a lifetime ago and then just stopped using it because of histrionic bitches.
The Germans are making noises about re-activating their reactors despite the Green fascists and the usual mealymouthed claims from politicians: https://archive.ph/MPzZU
Germany get what they deserve for shutting down their landlocked nuclear plants because a tsunami hit one on the other side of the hemisphere. As do France and every other EU nation that were stupid enough to listen to Greenpeace and other morons.
Yep. Probably takes like what?? 3 to 5 years to build and get a nuclear power plant online if there is no red tape??
Upper estimates can sometimes say 20 years but that's likely not entirely accurate as it probably includes a lot of the planning stages beyond the actual construction. Then again using larger numbers like that to dissuade the general public isn't exactly a new thing and if ever called out on it the phrasing is still "technically correct".
I don't think anybody has any idea how long it actually takes to build a nuclear power plant without artificial constraints put on the process.
pretty sure Europeans would be capable of putting a Notre Dame with a nuke reactor in it in every capital city in Europe in a year if nobody tried to fill their pockets in the process
Thing is:people who own them said they can start again without issues. The retarded lefty green coalition will not allow it though when the supposed """right wing""" were not up for it(in quotes because the CDU/CSU has got nothing to do with conservatism, if they did they would form a coalition with the afd).
They've made the whole process and bureaucracy so bad it takes decades to start pouring the concrete, if you can even get that far.
It is greatly frustrating that humans unlocked the secret to cheap, clean and unlimited energy a lifetime ago and then just stopped using it because of histrionic bitches.
The Germans are making noises about re-activating their reactors despite the Green fascists and the usual mealymouthed claims from politicians: https://archive.ph/MPzZU