Win / KotakuInAction2
KotakuInAction2
Communities Topics Log In Sign Up
Sign In
Hot
All Posts
Settings
All
Profile
Saved
Upvoted
Hidden
Messages

Your Communities

General
AskWin
Funny
Technology
Animals
Sports
Gaming
DIY
Health
Positive
Privacy
News
Changelogs

More Communities

frenworld
OhTwitter
MillionDollarExtreme
NoNewNormal
Ladies
Conspiracies
GreatAwakening
IP2Always
GameDev
ParallelSociety
Privacy Policy
Terms of Service
Content Policy
DEFAULT COMMUNITIES • All General AskWin Funny Technology Animals Sports Gaming DIY Health Positive Privacy
KotakuInAction2 The Official Gamergate Forum
hot new rising top

Sign In or Create an Account

30
Huge Data Center (For Ai) To Be Built In Utah. Will Require 9 GW/h of power. The State Of Utah Uses 5... (www.tomshardware.com)
posted 38 days ago by 5Cats 38 days ago by 5Cats +30 / -0
New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's...
The 40,000-acre project will run entirely off-grid using natural gas.
www.tomshardware.com
16 comments share
16 comments share save hide report block hide replies
You're viewing a single comment thread. View all comments, or full comment thread.
Comments (16)
sorted by:
▲ 7 ▼
– RoulerBleu 7 points 37 days ago +7 / -0

Solar and wind are for the plebs who will get rolling blackouts when it's -30° in the Winter and 90° in the Summer.

The stable electricity will be for the AI datacenters.

permalink parent save report block reply
▲ 1 ▼
– 5Cats [S] 1 point 37 days ago +1 / -0

Um, yeah. That's kind of my point, eh?
W&S simply don't work. They require 100% backup OR rolling or even total blackouts that could last for days. Alarmists never seem to grasp this concept.

The greenies seem to think that 9GB of W&S needs 9GB of battery backup. Nope! To run for 2 days off batteries requires 9x48GB of backup battery capacity. 96GB capacity, at 4X the cost per GB of the W&S it backs up. IF the technology existed to do the job, it doesn't. Alarmists are stupid.

Or 9GB of Gas or Nuclear... but if you're building 9GB of gas, why build W&S (at twice the cost) at all? 🤔 Hydro is out, there are NO more large hydro projects left that could be viable.

permalink parent save report block reply

Original 8chan Links to Gamer Gate:

.

The main GG discussion is on the videogames board: https://8chan.moe/v/

.

GamerGate archive is at https://8chan.moe/gamergatehq/

.

GamerGate Wiki:

https://ggwiki.deepfreeze.it/index.php/Main_Page

. . . . . .

. . . . . .

Rules:

.

ONE: Do not advocate for illegal violence or post other illegal activity. (Be aware of your local laws.)

.

TWO: Don't threaten, harass, or impersonate users. Also: don't be a psycho. New users will be held to a higher standard.

.

THREE: Do not post porn.

.

FOUR: NSFW/NSFL content must be flaired NSFW.

.

FIVE: No vote manipulation. Do not break communities.win's features.

.

SIX: No spam or reposts. Do not make more than 5 threads a day.

.

SEVEN: Do not post falsehoods and hoaxes that are obvious to an uncontroversial degree.

. . . . . .

. . . . . .

Moderation Logs:

.

(Two different versions, Scored has more features and is cleaner, but .win let's you see a few more details in certain instances.)

  • Scored
  • .win

Moderators

  • DomitiusOfMassilia
  • C
  • BandageBandolier
  • CarmenOfSandiego
  • The_Shadow_of_Intent
  • SocraticMethod1
  • Kienan
  • Smith1980
Message the Moderators

Terms of Service | Privacy Policy

2026.02.01 - whmbz (status)

Copyright © 2026.

Terms of Service | Privacy Policy