You don't need to worry about that, nuclear takes time to build the infrastructure and facilities required to utilise it.
DEI hires have a very short attention span so they wouldn't get past the design phase before they go 'too hard, put a wind turbine on instead so I don't need to maintain it'. That's the thing about a lot of the 'green energy' grift, they're all passive ways of getting power but by result produce little amounts.
You don't need to worry about that, nuclear takes time to build the infrastructure and facilities required to utilise it.
DEI hires have a very short attention span so they wouldn't get past the design phase before they go 'too hard, put a wind turbine on instead so I don't need to maintain it'. That's the thing about a lot of the 'green energy' grift, they're all passive ways of getting power but by result produce little amounts.
So do airplanes.