I looked it up. Apparently 1 project, the middle one, Palm Jumeirah, was completed, sold, and profitable. The second one, Palm Jebel Ali, was in construction when the 2008 financial crisis hit and frozen from that time. The third one had very little work done but is being slowly built out over time, not as residential.
I looked it up. Apparently 1 project, the middle one, Palm Jumeirah, was completed, sold, and profitable. The second one, Palm Jebel Ali, was in construction when the 2008 financial crisis hit and frozen from that time. The third one had very little work done but is being slowly built out over time, not as residential.